In Boliden Mineral AB’s new mine, Rävliden norra, Bergteamet Raiseboring Europe has been commissioned to drill an exhaust air shaft of 790 meters. The project will be launched in the summer of 2019.
Master drilling Europe
Office
Strandgatan 22
931 31, Skellefteå
Sweden
Workshop
Boliden Industrial Area
936 32, Boliden
Sweden
Contact
Phone: +46 910 – 41 58 00
europe@masterdrilling.com